Virtual net metering in Maharashtra: what the 2024 rules allow, and where they stand
By Rahul Rajan, Founder & CEO, Protostar Technologies
Updated · 15 min read
The short answer
Virtual net metering (VNM) lets a housing society's flats share credits from one solar plant, in a ratio set in an agreement their Lead Person signs. Maharashtra's MERC notified it on 29 August 2024, but MSEDCL has challenged the rules in the Bombay High Court and is not approving VNM applications, even after MERC penalised it in October 2025. So VNM is not an option for societies in MSEDCL's area today. The same rules allow a society's grid-connected micro-grid, which needs no energy accounting by MSEDCL: Protostar Technologies' SPDUs share the power itself among the flats in hardware, and a building can add one common battery bank, which no VNM layout can include.
Key facts
- The rules: MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024, No. MERC/Tech/Regulation/0537, notified on 29 August 2024.
- Who can use VNM: residential consumers in a multi-storey building of one housing society or apartment owners' association, with their common connection, in one DISCOM's area.
- How credits are split: by the ratio in the net metering agreement, which can change once a financial year on two months' notice through the Lead Person.
- Status: MSEDCL is not approving VNM applications. MERC penalised it under Section 142 of the Electricity Act on 14 October 2025, and as of 12 October 2026, Case No. 222 of 2024 awaits a final order.
- Storage: a society may set up a grid-connected micro-grid "with or without storage".
- The limit: VNM moves bill credits, not power, so it gives a flat nothing during a power cut.
What is virtual net metering?
Virtual net metering (VNM) is a billing arrangement that lets several electricity consumers share the output of one solar plant without being wired to it. The plant exports its energy to the grid through a generation meter or a net meter, and the DISCOM credits that energy to the participating consumers' bills in an agreed ratio. No wiring changes and no power moves to a particular flat. Only the numbers on the bills do.
Ordinary net metering is different. There, the plant sits behind one consumer's meter and offsets only that consumer's bill. That is why a society's common-area plant cannot help individual flats under ordinary net metering, and why VNM exists.
In Maharashtra, Regulation 2.1(z)(a) defines VNM as a modality in which a renewable energy system's exported energy "is adjusted in either one or more than one electricity service connection(s) of participating Residential consumers(s) situated in multi storied building of same housing society or apartment owners association including their common connection within the same Distribution Licensee's area of supply".
What do Maharashtra's virtual net metering rules say?
Maharashtra's virtual net metering rules are the MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024 (PDF), notification No. MERC/Tech/Regulation/0537, published in the Maharashtra Government Gazette on 29 August 2024 and in force from that day. They amend MERC's 2019 rooftop regulations, which extend to the whole of Maharashtra, so they bind every DISCOM in the state. These are the clauses a housing society needs, in plain words.
| Clause | What it says |
|---|---|
| Reg. 2.1(z)(a) | Defines VNM: energy exported through a generation meter or net meter is adjusted across the connections of participating residential consumers in a multi-storey building of one housing society or apartment owners' association, including their common connection, within one DISCOM's area |
| Proviso to Reg. 2.1(z)(a) | A housing society or apartment owners' association may set up a grid-connected micro-grid "with or without storage" to serve several residential consumers, or to optimise emergency diesel use |
| Reg. 2.1(j), 4th proviso | A resident of a multi-storey building may set up the plant anywhere in the same DISCOM's area and take its energy under VNM |
| Reg. 2.1(j), 5th proviso | Several residents and their common connection may set up one plant at a common place, capped at the sum of what each could install |
| Reg. 2.1(m)(a) and 4.5 | A Lead Person nominated by the participants signs the net metering agreement for all and handles correspondence with the DISCOM. Changing the Lead Person needs written approval from every participant |
| Reg. 8.11 | The DISCOM installs an additional check meter for the plant's generation meter |
| Reg. 11.10(a) to (d) | Credits go on each participant's monthly bill by the ratio in the agreement, changeable once a financial year on two months' notice. Each time-of-day block is matched first, unused credits carry forward, and year-end surplus is bought at MERC's generic tariff |
| Reg. 11.10(e) and Annexure-3, 8.7(g) | No open access charges or losses until rooftop solar in Maharashtra reaches 5,000 MW. Under the model agreement, agreements signed before then keep the exemption while they are valid |
| Annexure-1(c) | The DISCOM has 15 days for a feasibility study, or the proposal is presumed feasible. Complete applications up to 10 kW are deemed accepted |
Two caps are built in. Each participant's slice of the plant cannot exceed what that consumer could net meter alone, which MERC's rules tie to its sanctioned load or contract demand, and the whole plant is capped at the sum of those slices.
How does virtual net metering work in a housing society?
In a housing society, virtual net metering runs on one agreement, one Lead Person and one sharing ratio. The participating flats, and the society's common connection if it joins, nominate a Lead Person from among themselves. Under Regulation 4.5, the Lead Person signs the net metering agreement for everyone and handles all correspondence with the DISCOM.
The agreement lists every participant with a sharing ratio in per cent, starting with the Lead Person's own connection. Each month, the plant's exported energy is credited to each participant's bill in that ratio. Within a bill, consumption in a time-of-day block is first set against generation in the same block, and any surplus is treated as off-peak energy, or as normal-time energy for a consumer not on time-of-day tariffs. Credits a flat cannot use carry forward to its next bill.
A society can set the ratio any way its members agree, for example in proportion to what each flat paid towards the plant, and change it once a financial year on two months' notice through the Lead Person. An SPDU works differently: each flat's share is enforced by its own SPDU in the meter room and shown live in the Nova app.
What is the difference between virtual net metering and group net metering?
Group net metering spreads one plant's surplus across several connections of the same consumer, while virtual net metering spreads it across different consumers. In Maharashtra, group net metering came first, in MERC's First Amendment of 2023 (Regulation 2.1(k)(c), gazetted on 16 November 2023), which adjusts surplus energy "in more than one electricity service connection(s) of the same consumer". Virtual net metering followed on 29 August 2024, for different residential consumers in one society's building. MNRE's national guidance of 23 February 2023 draws the same line, and leaves the final definition to each state's regulator.
For a housing society, the difference is who owns the connections. Connections in the society's own name, such as separate meters for lifts, pumps and common lights, belong to one consumer, so group net metering can spread one plant across them. Each flat is a separate consumer, so sharing a plant's credits across the flats' own bills needs virtual net metering. Both depend on MSEDCL processing applications. On 14 October 2025, MERC imposed a similar Section 142 penalty on MSEDCL in Case No. 45 of 2025, over group net metering and net metering up to 5 MW.
Can a society get virtual net metering from MSEDCL today?
Not in practice. MSEDCL (Mahavitaran, often still called MSEB) has had an online VNM form since early 2025, but it is not approving VNM applications. It has challenged the regulations in the Bombay High Court, and MERC has penalised it for keeping applications pending.
- 3 December 2024: Brookhill CHS, Harmony Sky Suites CHS and Royce CHS file Case No. 222 of 2024 to have VNM enabled.
- 10 December 2024: MERC directs MSEDCL to make its VNM portal operational within 15 days.
- 9 September 2025: In Case No. 226 of 2024, MERC directs MSEDCL to process VNM applications in hard copy.
- 14 October 2025: MERC finds that MSEDCL "has kept the applications pending by siting [sic] procedural issues" and imposes a ₹1,00,000 penalty under Section 142 of the Electricity Act, plus ₹6,000 a day if the applications are not approved within 7 days.
- 31 October 2025: MERC calls it "deliberate non-compliance" and gives MSEDCL a last 7 days, failing which the penalty is to be recovered from the Chief Engineer responsible.
- 25 March 2026: After a fresh hearing, the case is reserved for order.
Status as of 12 October 2026
MSEDCL is not approving VNM applications. No final order has been published in Case No. 222 of 2024, and no commissioned VNM system appears in MERC's public record. MSEDCL has challenged the regulations in the Bombay High Court, and MERC recorded on 14 October 2025 that no stay had been granted.
Does virtual net metering keep the lights on in a power cut?
Virtual net metering does not keep the lights on in a power cut. It is a billing arrangement for a grid-connected plant, and a grid-tied inverter's anti-islanding protection switches it off when the grid fails, so that it never sends power into lines that DISCOM staff may be repairing. The flats get nothing from the plant until the grid returns.
The rules do make room for storage. The proviso to Regulation 2.1(z)(a) lets a housing society set up a grid-connected micro-grid "with or without storage" to serve several residential consumers or to optimise emergency diesel use. MERC's Statement of Reasons explains that a society micro-grid, with or without battery storage and integrated with a diesel generator, "will help in utilisation of Solar energy which otherwise cannot be utilised when supply from the Distribution Licensee is not available", and describes it as a society-level micro-grid "using virtual net-metering" (p. 8). In practice, a battery cannot be built into a VNM layout: the flats draw only from their own DISCOM meters, so there is no electrical path from a common battery to any flat.
Protostar Fusion takes a different path. Its shared solar plant and shared lithium battery bank never connect to the grid, so it needs no VNM and no net metering at all. Every flat gets a shared part of the solar plant and the battery bank through its own SPDU. No SPDU building has a battery yet. Fusion's hybrid storage stack is built and running in simulation.
What was Protostar's role in the VNM regulation?
Protostar Technologies Pvt. Ltd. was one of nine stakeholders who commented on the draft, listed fifth in Annexure-I of MERC's Statement of Reasons (p. 21), alongside MSEDCL, Adani Electricity Mumbai and the Government of Maharashtra. Its written submission, made during the public consultation that closed on 14 June 2024, is recorded in the Statement of Reasons.
Protostar argued that every flat could be powered by a hybrid system using one large common battery, since an export-only system wastes its generation during an outage (p. 6). It proposed settling energy at a common net meter for the building, with the electricity "allocated to each apartment via Energy Allocation Devices (EAD)/Smart Power Distribution Unit (SPDU)" (p. 7).
In the final regulations, MERC accepted a request, which Protostar's submission included, that where technically feasible one of a housing society's existing connections can serve as the net metering connection, with surplus adjusted against the other participants in a pre-specified ratio (p. 7). It also added the society micro-grid proviso after the consultation (p. 8). It did not accept Protostar's request to exempt the common connection from load enhancement (pp. 16 and 17). More on our impact page.
Virtual net metering or an SPDU: what is the difference?
Virtual net metering is accounting, not distribution: it moves credits between bills after the fact, while an SPDU moves the power itself. One SPDU per flat, in the meter room, switches that flat's supply onto the shared plant, meters what the flat takes and moves it back to its own meter when its share is used, so the flat runs on its share in real time.
MERC's 2024 rules also allow a housing society to set up a grid-connected micro-grid "with or without storage" (proviso to Regulation 2.1(z)(a)), and that is the route Protostar takes. It does not need MSEDCL to do the energy accounting. MSEDCL net meters only the society's common connection, as for any rooftop plant, and each flat's SPDU measures and allocates that flat's share in hardware. This is the hardware-based approach Protostar put to MERC in its 2024 submission. Because the sharing happens in the meter room and not on the bills, the building can add one large common battery bank and share its stored energy flat by flat. VNM cannot do that. In a VNM layout the plant exports to the grid through its own meter and every flat stays on its own DISCOM meter, so the single-line diagram has no point where a common battery could supply the flats. Only the credits move between bills.
- Where the benefit shows: with VNM, as a credit on a bill. With an SPDU, as units that never appear on your flat's own meter.
- Power cuts: a grid-connected VNM plant gives a flat nothing during an outage. Protostar Fusion is designed to keep every participating flat running from its share of a shared battery bank.
- Evenings: VNM cannot allocate stored energy to a flat at 9 pm. Fusion is designed to store the day's sunshine for the evening.
- Paperwork: VNM needs the DISCOM to approve a multi-party agreement and fit a check meter. Protostar's grid-connected microgrid is net metered on the society's common meter, and Fusion needs no net metering at all.
- Changing shares: a VNM ratio changes once a financial year. An SPDU share can grow with panels added in your name, roof permitting, or by buying part of a neighbour's share.
What can a housing society do instead of waiting for virtual net metering?
As MSEDCL is not approving virtual net metering, a society that wants solar for its flats now needs another route. These are all available in Maharashtra today.
- Common-area solar on the common meter, under ordinary net metering, with PM Surya Ghar support for a society's common facilities.
- Members' own panels with their own net meters, if the terrace allows.
- A shared plant with an SPDU at every flat's meter. Protostar's grid-connected microgrid is net metered on the society's common meter, as in its Pune buildings since 2019, and it pauses in a power cut.
- Protostar Fusion: shared solar, a shared lithium battery bank and an SPDU per flat, built for whole-home backup. The plant never connects to the grid, so no net metering of any kind is involved.
Ordinary net metering has also become simpler. Under MERC's Practice Direction of 30 June 2026, the agreement a consumer accepts while applying online counts as the net metering agreement, so the DISCOM cannot insist on a separate physical one. Compare every option in our guide to solar for flats.
Frequently asked questions
Is virtual net metering mandatory for housing societies in Maharashtra?
No. MERC's 2024 Regulations give residents of a housing society the right to choose virtual net metering, and no society has to use it. What is compulsory is the DISCOM's duty to process VNM applications under the Regulations. That duty is what Case No. 222 of 2024 is about, and MERC penalised MSEDCL under Section 142 of the Electricity Act on 14 October 2025 for not carrying it out.
Can a flat without terrace access use virtual net metering?
Only on paper. The 4th proviso to Regulation 2.1(j) of MERC's rooftop regulations, added on 29 August 2024, lets a resident of a multi-storey building set up a plant anywhere within the same DISCOM's area and take its energy under virtual net metering. A flat with no roof space of its own could therefore join a plant on another building's roof or elsewhere in that area, but only once MSEDCL approves the application, and MSEDCL is not approving VNM applications today.
How much solar can each flat get under virtual net metering?
No more than that flat could have net metered on its own. Regulation 11.10(a) of MERC's Second Amendment Regulations, 2024 caps each participant's share of the plant at the capacity it is eligible for under net metering, which MERC's rules tie to the consumer's sanctioned load or contract demand. The 5th proviso to Regulation 2.1(j) then caps the whole plant at the sum of those individual capacities.
What happens to unused virtual net metering credits at the end of the year?
Unused credits carry forward from bill to bill within the financial year. At the end of the year, Regulation 11.10(d) applies the existing net metering rule, Regulation 11.4(c) of MERC's 2019 regulations: the DISCOM buys each participant's unadjusted units at the generic tariff MERC approves for that year, within the following month, and the carried-forward balance resets to zero.
Does the PM Surya Ghar subsidy apply to virtual net metering?
Yes, in principle. MNRE's PM Surya Ghar guidelines make plants under virtual net metering and group net metering eligible for the central subsidy if the plant is on a roof, terrace, balcony or elevated structure and the DISCOM approves the metering arrangement. In MSEDCL's area that approval is not being given today. MNRE's clarification of 13 February 2025 says the scheme intends to let apartment dwellers take part through VNM. The guidelines do not spell out how the subsidy is split between participating flats.
Does virtual net metering apply to Adani Electricity, Tata Power and BEST customers in Mumbai?
Yes. MERC's rooftop regulations extend to the whole of Maharashtra, so they bind the Mumbai DISCOMs too. In their tariff cases decided on 28 March 2025, Adani Electricity and Tata Power told MERC they were following the VNM regulations, and BEST said the issue was outside that petition. As of 4 October 2026, MERC's public records show no VNM dispute against any of the three. Every VNM case we found in MERC's records has been against MSEDCL.
Sources
- MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024, No. MERC/Tech/Regulation/0537, notified 29 August 2024, MERC
- Statement of Reasons for the Second Amendment Regulations, 2024, MERC
- MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) (First Amendment) Regulations, 2023, gazetted 16 November 2023 (group net metering), MERC
- MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 (principal regulations), MERC
- Daily order in IA No. 79 of 2024 in Case No. 222 of 2024, 10 December 2024, MERC
- Daily order in Case No. 226 of 2024, 9 September 2025 (hard-copy applications), MERC
- Daily order in Case No. 222 of 2024, 14 October 2025 (Section 142 penalty), MERC
- Daily order in IA No. 104 of 2025 in Case No. 45 of 2025, 14 October 2025 (group net metering and 5 MW net metering), MERC
- Daily order in Case No. 222 of 2024, 31 October 2025, MERC
- Reserved-for-order statement, 25 March 2026 (Case No. 222 of 2024), MERC
- Practice Direction recognising digital agreements for rooftop renewable energy systems, 30 June 2026, MERC
- MYT order for Adani Electricity Mumbai (distribution), Case No. 211 of 2024, 28 March 2025, MERC
- MYT order for Tata Power (distribution), Case No. 210 of 2024, 28 March 2025, MERC
- MYT order for BEST, Case No. 207 of 2024, 28 March 2025, MERC
- Application for a renewable energy generating system under virtual net metering (online form), MSEDCL
- Guiding SOP for implementation of virtual net metering and group net metering, 23 February 2023, MNRE
- PM Surya Ghar: Muft Bijli Yojana, operational guidelines for CFA to residential consumers, 7 June 2024, MNRE
- Clarification on PM Surya Ghar for apartment dwellers through virtual net metering, 13 February 2025, MNRE
Read next
See what your roof can do
MSEDCL is not approving VNM, so there is no need to wait for it. We will look at your terrace and your meter readings, and cost every route that works today side by side for your society.